St. Andrew United Methodist Church –

 

St Andrew United Methodist ChurchSt Andrew United Methodist ChurchSt Andrew United Methodist Church

 

Co-chair of Building Committee wrote, “From the initial engagement through the design and construction, I found Robert to be personable, able to connect, communicate, and problem solve with members of our congregation, staff, and committee members. Associated details were put forth to provide a product that was delivered on time and on budget, achieving our goals and meeting our expectations.”

Second phase 30,000 square foot addition included 950-seat multipurpose sanctuary with 150-person choir, new pipe organ, and the latest technology. Also included were a large atrium, three large multipurpose classroom, and remodeling of parts of the existing facility. Energy saving design features included xeriscape landscaping, low-water-use plumbing fixtures, daylit spaces, and a mechanical system that is half the cost of a conventional system. The addition was designed to last 50 to a 100 years. Highlands Ranch, Colorado.

Robert Lee served as Senior Architect and Project Manager for this project while at SLATERPAULL Architects. The design concept was created by Mr. Clayton Cole. Most of the client contact was done by Robert.

creating “IN” architecture:

where people want to hang-out and join-in